Administrative buildings
Karlín Appartment / 2021Complex design and installation of a rooftop apartment inside an administrative building. We executed all technical work, from electrical installations to lighting. We installed a double floor with underfloor heating, which can be individually adjusted from each room. We also oversaw production and installation of a three-layer wooden floor. To keep the rooms cool in the summer months, we used radiant ceiling panel technology on the ceilings. We also led the implementation of glazed interior partitions and fully remodeled two bathrooms to the highest standards.








Fitouts & Interiors
Interiors
Fitout Bořislavka / 2021General construction and supply of fitout interiors, made to scale, for the Borislavka center under the leadership of PBW Group and PBW Interiors. We were inspired by the asymmetry of natural crystals and modeled the unique interiors accordingly, thus creating some complexities in the scope of work. We were responsible for dividing the space, creating interior partitions, carpentry work, acoustic elements, original screeds, tiling, paving, supply of amenities and creating unique custom furniture. The wooden installation of an oak floor-inspired ceiling was very technologically demanding, considering some of the rooms required an acoustic design.














Fitouts & Interiors
Interiors
GEMINI PROJECT 2020 / 2020Fitout of office space in the GEMINI Prague 4 building with an area of 2850 m2. We executed a start-to-finish project through the process of Design & Build. Part of our facilitation included regularly monitoring and reporting project benchmarks to the client. Our biggest challenge was the time frame of the project.
The approval of the premises was required as soon as four months following the signing of the work contract. Another unique aspect of the project was the wide scope of the required elements, along with our goal of exceeding the high expectations of the international client. Our team ensured that every detail, no matter how complex or simple, was executed in a timely manner.








Fitouts & Interiors
Shopping centers and public spaces
Hard Rock Cafe / 2009Dazzling and stunning interior of a famous restaurant chain. This project combined the implementation of a complex interior, complicated structural load and fire safety modifications, and historical preservations in the stunning house of U Rotta. The result of this project speaks for itself. The original charm of the home was preserved, with an elegant and modern twist. We facilitated this project in a very short time-frame, under the supervision of an architectural studio from Great Britain. Our team takes great pride in the results of this project.




Fitouts & Interiors
Shopping centers and public spaces
OC Chodov / 2017We played an integral role in the conception and implementation of the interior design of Westfield Chodov, the largest Czech shopping center. Our concept was based on a unique play on light with gold accents. The sun’s rays fall into the space through the central skylight, illuminating the entire space with a bright and optimistic atmosphere. For the interior design, we applied wooden cladding for the skylight, cladding of the express escalator and coating from the PBW Interiors coating portfolio, as well as cladding the interior with etched glass and mirrors.



Fitouts & Interiors
Spa & Wellness
CAPI HNIZDO / 2015Luxurious SPA & WELLNESS center in the Capi Hnizdo hotel, with an interior that evokes the sensation of being underwater. The concept was inspired by the nearby pond and the surrounding landscape of Bohemian Siberia. Solid wood, stone, and water were utilized to illustrate the concept. We supplied all spa features and appliances, including pool technology, HVAC, stainless steel pools, saunas, steam technology, and Turkish baths. In addition to construction work, we were in charge of the production and assembly of the majority of the interior appliances and furniture, along with stone masonry and tiling work.


